Part of the Bridging Kentucky Program
The bridge over Cowbell Creek replaced with precast culvert at milepoint 2.50
LEXINGTON, Ky. (July 9, 2019) – The Kentucky Transportation Cabinet (KYTC) advises motorists that replacement operations are near completion for the bridge on Battlefield Memorial Highway/US 421. The project began June 17 with the bridge closed to traffic for work. The existing bridge was replaced with a precast culvert. Operations will continue for guardrail installation with intermittent temporary lane closures.
Tuesday, July 9
Battlefield Memorial Highway/US 421
• The bridge located over Cowbell Creek at milepoint 2.50 is now open
Visit this website for information about the Bridging Kentucky Program: https://bridgingkentucky.com
Navigate traffic with KYTC, http://goky.ky.gov, and WAZE, www.waze.com!
https://www.facebook.com/KYTCDistrict7
https://twitter.com/KYTCDistrict7
###